ErrorException Message: Argument 2 passed to WP_Translation_Controller::load_file() must be of the type string, null given, called in /home/viqisapahosting/public_html/khangducconst.com/wp-includes/l10n.php on line 838
https://khangducconst.com/wp-content/plugins/dmca-badge/libraries/sidecar/classes/ Tạ Trung Tín, Author at Khang Duc Investment & Construction JSC - Page 8 of 8
What is EPC & BOP for wind farm?

What is EPC & BOP for wind farm?

Basically there are 3 types of Wind Farm contracts commonly used: Supply only. It include WTGs, SCADA, Installation supervision and Commissioning.Supply and Installation, including all the items in Supply only plus WTGs transport and cranes for the installation...
Wind energy potential of Viet Nam

Wind energy potential of Viet Nam

in Vietnam, several wind measurement studies are conducted. Vietnam is considered to have the best wind resources in Southeast Asia, especially in the nearshore/offshore and onshore coastal regions in the south of Vietnam. In these areas yearly average windspeeds of 9...