Cai Mep international Container Terminal
Promoting the
Location
Phu My, Tan Thanh, Ba Ria Vung Tau.
Contractors:
1. TOA-TOYO Japan.
2. Penta Ocean – Rinkai Japan.
Why do customers choose Khang Duc?
– Supported a very big main contractor in completing and handing over to investors, with a high cooperation spirit. Quality guaranteed.
– Provide simple construction plan,
PROJECT DETAILS
Project implementation time: 2008 – 2012.
What we do:
- Spread the fabric and sand.
- Cleaning and painting steel pipe piles.
- Reinforced concrete beams cast in place.
- Precast beams and slab.
- Layout the floor in place.
- Plastic concrete foundation.
- Construction of geotextile and sand filling.
- Cleaning and painting steel pipe piles.
- Reinforced concrete beams cast in place.
- Layout the floor in place.
- Plastic concrete foundation.
- Construction of port structure.
- Construction of prefabricated beams and slabs.
- Construction of container yard
- Installing and installing FRB to the pile head.
- ICB brick construction.
- Construction of geotextile and sand filling.
- Cleaning and painting steel pipe piles.