Cai Mep international Container Terminal

Home » Projects » CAI MEP INTERNATIONAL CONTAINER TERMINAL PROJECT

Project implementation time: 2008 – 2012.

Scope of work:

  • Spread the fabric and sand.
  • Cleaning and painting steel pipe piles.
  • Reinforced concrete beams cast in place.
  • Precast beams and slab.
  • Layout the floor in place.
  • Plastic concrete foundation.
  • Installing and installing FRB to the pile head.
  • Construction of container yard
  • ICB brick construction.