EPC contractor for wind farm in Viet Nam

Khang Duc constructs onshore and nearshore wind farm projects meeting clients’ requirements to schedule, quality, safety with competitive pricing. The planning, coordinating and supervising construction phases includes and not limited to:
  • Site Appraisal and Procurement.
  • Planning, Permits and Financing.
  •  Access Roads and Installation of the Foundation.
  • Cable installation.
  • Wind Turbine Construction.

Reach Us

khang duc investment & construction jsc

Company’s Headquarter

2-3-4, 6th Floor, SAV8 Tower, The Sun Avenue Building, 28 Mai Chi Tho St., An Phu Ward, Dist. 2, HCMC .

Vietnam

Tel: (+84) 286 656 5454

        (+84) 287 300 7678

Email: info@khangducconst.com

ONSHORE

Khang Duc has all the facilities and equipment including super-sized and super-heavy vehicles, cranes of all types, crawler cranes, tires of all kinds made by Japan, Germany and the USA with good quality and a team of skilled technicians with years of experience always meeting the most complex work requirements.

OFFSHORE

We manage, transport and install offshore wind turbine and fully integrated high voltage stations to clients specifications. We deliver powerful results while minimizing risks and project complexities inherent to offshore installation.

Khang Duc plans, coordinates and supervises the construction phases, including:

  • Site Appraisal and Procurement.

  • Planning, Permits and Financing.

  • Access Roads and Installation of the Foundation.

  • Cable installation.

  • Wind Turbine Construction.

Our actual construction process of wind power project from design survey to completion of construction:

1/ Investigation, Design

Site survey, implementation, design & detailed planning.

2/ Piling Work
  • Delivery pile from factory to fabrication yard for splicing/combination and marking.

  • Delivery pile from fabrication yard to site for piling barge.

  • Driving pile by flying hammer with guide frame for WTG foundation and Link Bridge.

  • Driving pile by piling barge for WTG foundation and Link Bridge

3/ Concrete Work

  • Installation clamp and support system.

  • Cut-off pile head; Installation rebar and pouring concrete for pile plug.

  • Installation rebar, formwork, grouding system, anchor cage and pouring concrete for lift 1.

  • Installation rebar, formwork, conduit, cooling system, and pouring concrete for lift 2.

  • Installation rebar, formwork, and pouring concrete for lift 3.

  • Girder installation for LB.

  • Handrail installation and final completion.

Construction of Tra Vinh wind farm project

process of wind power project

Our actual construction process of wind power project from design survey to completion of construction.

Investigation, Design

Site survey, implementation, design & detailed planning.

Piling Work

1/Delivery pile from factory to fabrication yard for splicing/combination and marking

2/Delivery pile from fabrication yard to site for piling barge

3/Driving pile by flying hammer with guide frame for WTG foundation and Link Bridge

4/Driving pile by piling barge for WTG foundation and Link Bridge

Concrete Work

1/Installation clamp and support system

2/Cut-off pile head; Installation rebar and pouring concrete for pile plug

3/Installation rebar, formwork, grouding system, anchor cage and pouring concrete for lift 1

4/Installation rebar, formwork, conduit, cooling system, and pouring concrete for lift 2

5/Installation rebar, formwork, and pouring concrete for lift 3

6/Girder installation for LB

7/Handrail installation and final completion